SPECIALISED IN SAFETY ENGINEERING AND INDUSTRIAL RISKS

specialist

Our references

En savoir +
Fire risk analysis
IMERYS
Belgium
Installations
Reception, storage and treatment of PFO (Pyrolysis Fuel Oil).
Accomplishments
  • Rapport d’analyse du risque incendie ;
  • Recommandations de mesures de prévention et protection active et passive ;
  • Cotation des mesures identifiées.
State of play of the existing fire safety system
SUEZ
France
Installations
Reception, regeneration and storage of solvents.
Accomplishments
  • Fire safety audit report;
  • Recommendations for preventive, active & passive fire protection measures;
  • Cost estimating of solutions.
Etude HAZID
DORIS Engineering
Paris
Installations
offshore Platform HNA
Accomplishments
  • HAZID study of the following installations: 
    • Wellhead Platform (HNA WHP)
    • 7 km multi-phase export shipping line from new HNA platform to existing HBD processing platform
    • Gas import line, water injection line
    • Changes to the existing HBD platform.
Assessment of health risks and interpretation of the state of the environment
Tractebel Engie
France
Exploitant
Suez
Installations
Methanisation unit
Accomplishments
  • Facility Emissions Assessment:
    • Inventory and description of sources,
    • Flow balance sheet;
  • Issues assessment
  • Selection of substances of interest;
  • Choice of risk tracers: Risk tracers are emitted substances likely to generate health effects in people who are exposed to them, they are selected according to several criteria: flow, toxicity, concentrations, fate; transfer potential, population vulnerability;
  • Conceptual diagram: identification of pollutant transfer pathways;
  • Assessment of the state of the environments: highlighting the vulnerabilities of the potentially impacted environments, before the start of operation. 
  • Health Risk Assessment: 
    • Hazard identification and dose-response relationships;
    • Characterization of exposures (modeling of the dispersion of releases from the installation); 
    • Characterization of risk.

 

Fire Project Management – Energy Recovery Unit
SUEZ
France
Installations
Wastes to Energy recovery unit
Accomplishments

SAFENGY supported SUEZ in improving site fire safety on the following points: APPEL D'OFFRE

  • Engineering studies ;
  • Technical specifications; 
  • Assistance for Call Tenders;
  • Technical and financial BID evaluation and assistance in the choice of contractors;
  • Detailed studies approval
  • Follow-up of the works and participating to site acceptance test of installations.
Fire engineering studies – Unit HDT-2
Axens Solutions
Argentine
Installations
HDT-2 unit (hydrotreating)
Accomplishments
  • Passive and active fire protection philosophies and layouts;
  • Fire and Gas detection philosophy and layouts;
  • Fire risk analysis;
  • Fire and Gas detection location study report ;
  • Hazardous area classification drawings and study;
  • List of fire & gas devices.
Fire engineering studies – ORC project
Enertime
Thaïlande
Installations
Waste heat recovery unit (ORC)
Accomplishments
  • Active fire protection layouts;
  • Fire and Gas detection philosophy and layouts;
  • Modeling of major accident scenarios; 
  • Fire and Gas detection Cause & Effect Matrix;
  • Hydraulic calculations note and water demand;
  • Technical data sheets for fire protection equipment and fire & gas detection devices; 
  • Technical specifications of fire protection equipment.
Feasibility of site renovation
Storengy ENGIE
France
Installations
Purification and underground storage of natural gas
Accomplishments
  • Note of HSE requirements;
    • Identification of Health, Safety and Environment (HSE) requirements applicable to the project in order to integrate them into the design studies;
    • Evaluation of the HSE impacts of the project and proposal of measures to reduce or even eliminate them.
  • Note de permitting;
    • Identification of administrative files and procedures necessary for the realization of the project;
    • Details of the regulatory references, the content of the administrative files, the legal or estimated deadlines and the interactions between the different procedures.
  • Preliminary hazard study
    • Selection of relevant scenarios impacted by the revamping from the existing site hazard study;
    • Assessment of their changes in terms of severity, criticality and probability of occurrence;
    • Creation of envelope maps of thermal and overpressure effects;
    • Conclusion on the impact of the site's current PPRT and the actions to be implemented.

Permitting note for a hydrogen production unit
ADISSEO
France
Installations
Chemical platform
Accomplishments
  • Definition of risks and hazards related to the hydrogen production unit; 
  • Analysis of regulatory and administrative documents; 
  • Definition of regulatory, construction and urban planning constraints; 
  • Determination of the installation's ICPE regime;
  • Identification of the administrative procedures to be carried out for the realization of the project.
HAZOP study of a refinery
Axens
France
Installations
Refinery
Accomplishments
  • HAZOP study of different units of the installation: 
    • Vaccum gasoil hydrotreating unit (VGO HDT)
    • Sulphur recovery unit (SRU)
    • Acid removal unit (ARU)
    • Sour water stripping unit (SWS 1 & 2)
    • PFCC gasoline hydrotreating unit (Prime-G )
Etudes SAFETY – Projet SHELL BUKOM
AXENS
Singapour
Exploitant
AXION - SHELL
Installations
Unité d’hydrotraitement d’essence
Accomplishments

Classification of hazardous areas

  • Table of hazardous sources
  • Zoning drawings

Fire protection

  • Fire protection philosophy (active and passive)
  • Active and passive fire protection layouts
  • Technical specification
  • List of equipment

Fire and gas detection

  • Fire and gas detection philosophy
  • Fire and gas detection layouts
  • List of equipment
  • Fire & Gas Detection Cause and Effect Matrix
Technical assistance for the construction of wind farms
RES
France
Installations
Wind farms
Accomplishments
  • Management of the subcontractors of the environmental studies necessary for the constitution of the environmental authorization files:
    • Landscape study, 
    • Fauna-flora study,
    • Wetland study;
  • Proofreading and validation of specific studies;
  • Finalization of Environmental Impact Studies and creation of non-technical summaries; 
  • Participation in the definition of projects taking into account environmental and landscape constraints; 
  • Taking into account the uploading of naturalist data for ongoing projects.
Hazard study - Agricultural methanisation unit
ENGIE
France
Exploitant
ABH
Installations
Biomethane production unit
Accomplishments
  • Unit Hazard Study: 
    • Distances from thermal, toxic and overpressure effects
    • Fire water calculation note
Preliminary hazard studies
Vinci Environnement
France
Exploitant
EDF-PEI
Installations
Combined Cycle Power Plant
Accomplishments
  • Hazard study for the ICPE part 
  • Hazard study for the Natural Gas supply pipeline part.
Design Verification Fire
FRANGAZ
France
Exploitant
FRANGAZ
Installations
2 wagon transfer stations – LPG filling center
Accomplishments

Hydraulic calculation note:

  • Calculations of pressure drops through fire protection systems
  • Estimation of the total flow of fire protection installations. 
  • Determination of the origin of the problem.
  • Proposal of solutions (nozzle cleaning, installation of a filter)
Our skills

OUR SECTORS OF INTERVENTION

ENERGY

ENVIRONMENT

CHEMISTRY / PETROCHEMISTRY

Construction

Our services / Our intervention formulas

Technical Assistance

Complete your team with Safengy engineers

Lump sum

Outsourcing your studies with a lump sum

Hybrid

We intervene according to the way which better matches, lump sum and/or in technical assistance, full or partial time.

safengy is :

+ 12 years
of expertise
+ 20 country
of intervention
40 customers
or more

THEY TRUST US